5pcs STM8S103F3P6 System Board STM8S STM8 Development Board Minimum Core Module Board
Use STM8S103F3P6 as the master IC
You can use 2.54 pin on the board or power supply pad, the pad when using power supply, input voltage range 4.5V-15V,
can output to the outside through pin 3.3V
Note: 5V pin's voltage is the input voltage of the module
Leads to all pins, the pins next to the pin marked the label, with a reset button, power LED, and the program demonstrates LED,
small but perfectly formed
Support SWIM debug mode
Technical Information:
The core board schematics (PDF format) and tested source. Burned into the test program, LED flashes, allowing you to detect the core board is working properly
Provide at IAR and STVD two development environments register operation and routine operation of the library functions. Timer routine, UART transmit routine, UART receive routines, clock switching routines, AD routines and so on
STM8 Applications
STM8 package library
IAR development environment, STVP programming software
STM8S103F3P6 performance comparison:
STM8S003F3 chips only 128 bytes of EEPROM, STM8S103F3 640 bytes
STM8S003F3 chip FLASH erase only 100 times, STM8S103F3 can erase ten thousand times
STM8S103F2 chip FLASH only 4K bytes, STM8S103F3 have 8K bytes
Conclusion: STM8S003F3 only suitable for mature products, STM8S003F3 core board is not suitable for development. However STM8S103F3 suitable for the development of the use of, our board of this development is the use of this chip
Size:28mm*17mm*5mm
Contact Sales
Your Name* | |
Your Email* | |
Topic* | |
Qty | |
Message | |
SUBMIT |
- Description
The development board using Micro USB cable supply, compatible with smart phone lines, data lines is simple and easy to get,
but not USB Mini line-powered.
STM8S core board of the main Package includes:
5 x STM8S103F3P6 System Board
- Reviews (29)
-
comment
- All(29)
- Q & A
-
: Where is the origin of Elecbee products? Are they certificated?2023-03-03
-
Answer:
Elecbee has long-term cooperation agreements with the OEM factories in China. So that we are able to reduce the intermediate channel cost, and help you save money. Our products are all made strictly according to the relative global standard, to ensure the products have good compatibility and excellent quality.
2023-03-03
-
: What forms of payment do you accept?2023-03-03
-
Answer:
Our main payment methods include Paypal, Credit Cards, Debit Cards, Bank Transfer, and more to discover. Please choose the payment methods in your favor.
2023-03-03
-
: When will you arrange shipment?2023-03-03
-
Answer:
After confirming receipt of your payment. We will arrange the delivery as soon as possible and upload the courier number to the website for you to track.
2023-03-03
-
: How to exchange or return?2023-03-03
-
Answer:
1. You can apply to return within 30 days after receipt of the goods. Please make sure the outside package is intact, and the product is in its original condition. We will arrange your refund according to the relevant provisions once the package is received.
2. Return process: You Apply for a Return - Approve the Return - Arrange a Return - Receive the Products and make Inspection - We arrange a Refund;
3. We will bear the freight charges for returns caused by us, for instance, the quality problem. As to returns caused by the buyer, the buyer should be responsible for the shipping fee.
2023-03-03
Related Products
EB0041463
EB0041469
EB0041484
EB0041489
EB0041496
EB0041829
EB0041931